DC Water

DC Water collects and treats wastewater as well as distributes fresh drinking water in the District of Columbia area. They have a large facility with a variety of processes, treatments, and equipment continually running to provide all their services to their customers.

The Problem

The cold temperatures of winter in the DC area was a big concern of operators and scientists for the highly valuable bacteria in large holding tanks at the facility. Complicating the demands of the tank was the restriction on the equipment to be used per the current air permit of the location, which the DOEE requires to be mechanically limited to 5 MMBTU/HR.

With various unknowns and numerous obstacles, Powerhouse was contacted to help design a workable system and provide the necessary equipment.

The Solution

Powerhouse’s internal engineering team designed a hot water heating coil system to work with the onboard heat exchanger of the RH-150 Portable Boiler Room to deliver efficient heating to the large tank of water. The coil system was able to be built on site and lowered into the tank to provide a method of heat transfer without contamination of the water in the tank.

Powerhouse was also able to mechanically limit the input of the RH-150 to 5 MMBTU/HR to stay within the current air permit of the facility. With a few part changes to the burner, the unit was modified to limit the firing rate per DOEE requirements.

The Result

Powerhouse was able to provide the engineering, design, and equipment to ensure the bacteria survived the cold winter months.

Have a similar problem?

Get a quote

Recent Case Studies

Constellation Energy Watertube Boilers

Constellation Energy

The Problem Powerhouse had been performing maintenance and repairs on two rental boilers that were steadily becoming less and less reliable and experiencing more frequent issues and failures. The undependable performance of the existing boilers was causing concerns with the ability to provide the steam required by the plant to feed the campus loop.

Learn More
Bonesaw Brewery Skid Mounted Boiler Case Study

Bonesaw Brewery

The Problem Bonesaw is a brand new brewery in Glassboro, NJ that needed a reliable boiler for their brewing processes. We were contacted late in the project so meeting fast deadlines was a concern as the building construction was underway. The building was designed for future expansion with the ability to add additional equipment to double production when ready.

Learn More